Health Sector |
Upgradation ICU & Operation Theaters at Allied Hospital, Faisalabad |
Cost: PKR 346.330 million | Status: Approved |
Transport Sector |
Rawalpindi-Islamabad Metrobus Project, Construction of Bus Depot near Peshawar Morr. |
Cost: PKR 1,477.762 million | Status: Approved |
Urban Development Sector |
Replacement of Pumping Machinery at Inline Booster Pump Station & Terminal Reservoir in Faisalabad. |
Cost: PKR 1,643.520 million | Status: Deferred |
Western Industrial Waste Water Treatment Plant for Faisalabad. (Concept Clearance Paper) |
Cost: PKR 9,850.000 million | Status: Cleared |
Comprehensive Master Planning for Water Supply, Sewerage, Drainage and Waste Water Treatment System in Rawalpindi. (PC-II) |
Cost: PKR 50.000 million | Status: Approved |
Feasibility Study and Detailed Design for Augmentation of Water Supply to Rawalpindi Based on Chahan Dam, Rawalpindi.(PC-II) |
Cost: PKR 20.000 million | Status: Approved |
Improvement of Jhal Khanuana Chowk, Faisalabad. |
Cost: PKR 2,292 .854 million | Status: Approved | Ex-agenda |
Information Technology Sector |
Automation of Stamp Paper (E-Stamping). |
Cost: PKR 207.224 million | Status: Approved |
Roads Sector |
W/I of Metalled Road from Lahore Sheikhupura Road km No. 29 Adda Joinwala More to Sheikhupura Muridke Road I/C Link to Punjab Apparel Park, District Shiekhupura (length 13.65 Km), Lahore. |
Cost: PKR 709.843 million | Status: Approved |
Widening / Improvement of Road from Kahna Katcha Road to Halloki Railway Crossing length=6.03 km (Part A&B) Lahore. |
Cost: PKR 366.262 million | Status: Approved |
Rehabilitation of road from Raiwind Phatak to Sui-Asal upto Ferozepur Road, length=17.47 km in District Lahore. |
Cost: PKR 571.608 million | Status: Deferred |
Widening / Improvement of Road from Paragon City to BRB Canal (Length 6.25 Km) Lahore. |
Cost: PKR 273.403 million | Status: Deferred |
Construction of Overhead Bridge on Railway Level Crossing, Sangla Hill City in District Nankana Sahib. |
Cost: PKR 465.408 million | Status: Deferred |
Construction of Metalled Road From Benazir Road at Railway Crossing 1/4/L to Renala Khurd along Railway Line) Via Education University Okara (L=15.30 km) in District Okara. |
Cost: PKR 281.741 million | Status: Approved |
Construction(Widening/Improvement) of Road from Gogera to Jandraka length=17.15 Kms in District Okara. |
Cost: PKR 225.430 million | Status: Deferred |
Widening / Improvement of Metalled Road from Kacha Paka Noor Shah Sahiwal Road, length=16.40 km District Sahiwal. |
Cost: PKR 260.991 million | Status: Approved |