10th PDWP

Health Sector

Upgradation ICU & Operation Theaters at Allied Hospital, Faisalabad
Cost: PKR  346.330 million | Status: Approved 
 

Transport Sector

Rawalpindi-Islamabad Metrobus Project, Construction of Bus Depot near Peshawar Morr.
Cost: PKR  1,477.762 million | Status: Approved
 

Urban Development Sector

Replacement of Pumping Machinery at Inline Booster Pump Station & Terminal Reservoir in Faisalabad. 
Cost: PKR  1,643.520 million | Status: Deferred
 
Western Industrial Waste Water Treatment Plant for Faisalabad. (Concept Clearance Paper)
Cost: PKR  9,850.000 million | Status: Cleared
 
Comprehensive Master Planning for Water Supply, Sewerage, Drainage and Waste Water Treatment System in Rawalpindi. (PC-II)
Cost: PKR  50.000 million | Status: Approved 
 
Feasibility Study and Detailed Design for Augmentation of Water Supply to Rawalpindi Based on Chahan Dam, Rawalpindi.(PC-II)
Cost: PKR  20.000 million | Status: Approved 
 
Improvement of Jhal Khanuana Chowk, Faisalabad. 
Cost: PKR  2,292 .854 million | Status: Approved | Ex-agenda
 

Information Technology Sector

Automation of Stamp Paper (E-Stamping). 
Cost: PKR  207.224 million | Status: Approved 
 

Roads Sector

W/I of Metalled Road from Lahore Sheikhupura Road km No. 29 Adda Joinwala More to Sheikhupura Muridke Road I/C Link to Punjab Apparel Park, District Shiekhupura (length 13.65 Km), Lahore.
Cost: PKR  709.843 million | Status: Approved 
 
Widening / Improvement of Road from Kahna Katcha Road to Halloki Railway Crossing length=6.03 km (Part A&B) Lahore.
Cost: PKR  366.262 million | Status: Approved
 
Rehabilitation of road from Raiwind Phatak to Sui-Asal upto Ferozepur Road, length=17.47 km in District Lahore.
Cost: PKR  571.608 million | Status: Deferred 
 
Widening / Improvement of Road from Paragon City to BRB Canal (Length 6.25 Km) Lahore.
Cost: PKR  273.403 million | Status: Deferred 
 
Construction of Overhead Bridge on Railway Level Crossing, Sangla Hill City in District Nankana Sahib. 
Cost: PKR  465.408 million | Status: Deferred 
 
Construction of Metalled Road From Benazir Road at Railway Crossing 1/4/L to Renala Khurd along Railway Line) Via Education University Okara (L=15.30 km) in District Okara. 
Cost: PKR  281.741 million | Status: Approved
 
Construction(Widening/Improvement) of Road from Gogera to Jandraka length=17.15 Kms in District Okara.
Cost: PKR  225.430 million | Status: Deferred 
 
Widening / Improvement of Metalled Road from Kacha Paka Noor Shah Sahiwal Road, length=16.40 km District Sahiwal. 
Cost: PKR  260.991 million | Status: Approved