10th PDWP

Confirmation of Minutes of the:-

i.          5th PDWP July 07, 2017        

ii.         8th PDWP Aug 01,2017

iii.        9th PDWP Aug 04,2017                   

PPH SECTOR                                                 

Khadim-e-Punjab Abe Sehat Project (Installation of Water Filtration Plants on Existing PHED Functional Rural Water Supply Schemes).

Cost: PKR 9253.000 million| Status: Approved      

YASAT SECTOR                                                         

YASAT Department’s DDSC: P&D Guidelines regarding revision of schemes and inclusion of additional scope in Sports Sector Schemes.

Issue:  Discussed

IRRIGATION SECTOR                                               

Improvement of Irrigation Water Supply at Tail Reaches of Irrigation Channels / Minors in Selected Area of Punjab.

Cost: PKR 6000.000 million| Status: Approved

ROADS SECTOR                                                        

Dualization of road from Muzaffargarh to D.G. Khan km No.74.00 to 94.60, length=20.60 km, D.G. Khan.

Cost: PKR 7220.225 million| Status: Approved

Dualization of road from Muzaffargarh to D.G. Khan km No.43.00 to 74.00, length=31.00 km, (from km No.43.00 to 76.90 i/c Proposed Bypasses length=33.90 km) Muzaffargarh.

Cost: PKR 6160.038 million| Status: Approved