Confirmation of Minutes of the:-
i. 5th PDWP July 07, 2017
ii. 8th PDWP Aug 01,2017
iii. 9th PDWP Aug 04,2017
PPH SECTOR
Khadim-e-Punjab Abe Sehat Project (Installation of Water Filtration Plants on Existing PHED Functional Rural Water Supply Schemes).
Cost: PKR 9253.000 million| Status: Approved
YASAT SECTOR
YASAT Department’s DDSC: P&D Guidelines regarding revision of schemes and inclusion of additional scope in Sports Sector Schemes.
Issue: Discussed
IRRIGATION SECTOR
Improvement of Irrigation Water Supply at Tail Reaches of Irrigation Channels / Minors in Selected Area of Punjab.
Cost: PKR 6000.000 million| Status: Approved
ROADS SECTOR
Dualization of road from Muzaffargarh to D.G. Khan km No.74.00 to 94.60, length=20.60 km, D.G. Khan.
Cost: PKR 7220.225 million| Status: Approved
Dualization of road from Muzaffargarh to D.G. Khan km No.43.00 to 74.00, length=31.00 km, (from km No.43.00 to 76.90 i/c Proposed Bypasses length=33.90 km) Muzaffargarh.
Cost: PKR 6160.038 million| Status: Approved