12th PDWP

Irrigation Sector

Feasibility Study for Dadhocha Dam. (PC-II)
Cost: PKR 48.760 million | Status: Approved | ADP No.959 (New)
 

Urban Development Sector

Construction of Multan Southern Bypass (Dual Carriageway) alongwith Service Road from LMQ Road to Bahawalpur Chowk Including Railway overhead Bridge Multan. (2nd Revised)
Cost: PKR 2,139.097 million | Status: Deferred
 
Construction of Northern Bypass from LMQ Road to Bosan Road (Dual Carriageway) with Service (Road length=9.00 km) (Phase-I), Multan. (Revised)
Cost: PKR 1,006.521 million | Status: Deferred