13th PDWP

Roads Sector

Improvement / Rehabilitation of Existing Multan Road, Lahore from Thokar Niaz Baig to Chauburji (Proposed Sewerage Drainage and Water Supply System) Package-III.
Cost: PKR  2,139.46 million | Status: Deferred | ADP No. 1298 (On-going)
 
Improvement / Rehabilitation / Dualization of Sheikhupura Muridke Road length 24 km in District Sheikhupura.
Cost: PKR  2,659.851 million | Status: Approved | ADP No. 1570 (New)
 
Dualization of Road from National Model School to Faisalabad Road / Sharqpur Chowk Via Sarwar Shaheed Road, Stadium and Qila City Sheikhupura length 3.54 km, Distt Sheikhupura. 
Cost: PKR  1,257.820 million | Status: Approved | ADP No. 1571 (New)
 
Widening Improvement of road from Kot Nainan to Sukho Chak (length=26.50 km) in District Narowal. 
Cost: PKR  465.466 million | Status: Approved | ADP No. 1550 (New)
 
Widening / Improvement of road from Kot Sujjan Singh to Jandiali Banglow length=19.00 km in District Khanewal. 
Cost: PKR  226.276 million | Status: Approved | ADP No. 1609 (New)
 
Construction of Overhead Bridge on the Railway Lines Between Jahanian Road to Police Station Sadder & Abdul Ghafoor Road, Khanewal.
Cost: PKR  661.057 million | Status: Approved | ADP No. 1604 (New)
 
Widening of road from Tranda Muhammad Panah to Allah Abad (length:16.00 km) Rahimyar Khan.
Cost: PKR  235.103 million | Status: Approved | ADP No. 1624 (New)
 
Construction of Dual Carriage Way from Burewala to Chichawatni Road, Vehari (Remaining Portion) from km 3.00 to 23.14 length:20.14 km in District Vehari. 
Cost: PKR  980.233 million | Status: Approved | ADP No. 1610 (New)
 
Construction of Kot Chutta Byepass length=7.00 km D.G. Khan. 
Cost: PKR  366.629 million | Status: Deferred | ADP No. 1616 (New)
 
Widening & Extension (10-20 Feet) of Mattle Road Pull Qadira Kot Mithan to Head Hamid length=14.60 km.
Cost: PKR  271.945 million | Status: Approved | ADP No. 1620 (New)
 
Widening / Improvement of road from Fazilpur to Hajipur (Phase-I) from 12 Feet to 20 Feet length 15 km, District D.G. Khan.
Cost: PKR  259.468 million | Status: Approved | ADP No. 1621 (New)
 
Widening & Extension (10-20 Feet) of Metalled Road Bait Sountra to Sahanwala length=23.88 km, D.G. Khan. 
Cost: PKR  331.916 million | Status: Approved | ADP No. 1619 (New)