Confirmation of Minutes of the:-

i           9th PDWP  Aug 04, 2017          

ii          10th PDWP Aug 11, 2017

iii         11th PDWP Aug 15, 2017

iv.        12th PDWP Aug 18, 2017

ROADS SECTOR                                                        

Widening / Improvement of Pattoki Kanganpur Road length = 54.10 kms District Kasur. (Revised)

Cost: PKR 1197.200 million| Status: Approved

Dualization of Kasur Depalpur Carriageway section from km 0.00 to 98.95, length=98.95 kms, Kasur & Okara. (Revised)

Cost: PKR 5961.671 million| Status: Approved     

Const./Widening & Imp. of road from Chowk 177 Murad to Chunan Wala via Chak No. 204/M, 203/M, 205/M, 206/M, 207/M & 209/M alongwith Adda 177/Murad to Pansota Chowk via 167/M Mor, 138/M & 140/M length 27.20 km, B/nagar.

Cost: PKR 534.177 million| Status:   Approved      

Construction of Metalled Road from Layyah Garh Maha Raja Road to Ameer Kalasra (L=50 km), Layyah.

Cost: PKR 486.050 million| Status:   Approved

Construction of Flyover / Overhead Bridge at Railway Crossing on Lodhran Jalalpur Road in Lodhran.

Cost: PKR 1165.422 million| Status: Deferred

Construction of road from Dhulla to Mangwal length 18 km, Chakwal.

Cost: PKR 579.597 million| Status:   Approved