15thPDWP

UD  SECTOR                                                                          

Changa Pani Program (Phase-II)/ Community Participation Program.             

Cost: PKR 333.256 million | Status: Approved

PPH  SECTOR                                                                        

Comprehensive Sewerage Scheme Chenab Nagar, Tehsil Lalian, Chiniot.                    

Cost: PKR 730.000 million | Status: Deferred`

TRANSPORT  SECTOR                                             

Construction of Multan Metro Project Corridor-I: BZU to Kumharan Chowk Passing through the Major Intersections of Northern Bypass, Chungi No.6, Chungi No.9, Fish Market, Daulat Gate, Chungi No.14, BCG Chowk and Vehari Chowk, Approximate length=18.50 km.(Package 5: Vehari Road to Chowk Kumharan, length=5.584 km) (Revised)                       

Cost: PKR 4267.038 million | Status: Deferred

ENERGY  SECTOR                                                                 

Hiring of Consultants for Review / Updation of Request for Proposal (RFP) and Feasibility Study for Selection of Sponsor(s) for 120 MW Taunsa Hydropower Project. (PC-II)                    

Cost: PKR 56.462 million | Status: withdrawn

IT  SECTOR                                                                            

GIS Integrated Computerization of Urban Immovable Property Tax (UIPT) System in Thirty Districts of Punjab.                      

Cost: PKR 864.327 million | Status: Approved

Land Records Management and Information Systems Project (Phase-I) (Revised).                

Cost: PKR 12,260.480 million | Status: Approved

ROADS SECTOR                                                        

Construction of Bridge Over River Ravi for Metro Bus System, Lahore.                       

Cost: PKR 664.051 million | Status: withdrawn

Widening / Improvement of road (Remaining Portion) Dewalian to Dhoke Tahlian length= 8.00 km i/c Construction of link road from Dewalian to Thal Chak L = 5.50 Km and Const. of Bridge (with approaches) over Bunnah Nullah on Dewalian Segal Abad Road L = 1.13 kms total length = 14.63 km District Chakwal.                       

Cost: PKR 238.685 million | Status: withdrawn

Widening / Improvement of Lahore Sargodha  Mianwali Bannu Road Art: 2 (Phase-II) from Kot Chandna to Dara Tang km No. 355.47 to 408.92 length=53.45 km, District Mianwali (Revised)

Cost: PKR 1989.063 million | Status: withdrawn

Widening / Improvement of metalled road from Adda Sardarpur to Sial Machine, (Remaining Portion) L=14.36 km, Distt. Khanewal.                     

Cost: PKR 212.064 million | Status: withdrawn

HEALTH SECTOR                               

Extension of Choudhary Pervez Elahi Institute of Cardiology Multan (Construction of New OPD & 208 Bedded Inpatient Block)                  

Cost: PKR 2013.330 million | Status: Approved

FORESTRY  SECTOR                                                 

Establishment of Zoo at Multan (PC-II)                 

Cost: PKR 7.700 million | Status: Approved

TOURISM  SECTOR                                                              

Punjab Cultural Heritage and Economic Growth Project.                       

Cost: PKR 5007.000 million | Status: Approved