16th PDWP

Education Sector

Up-Gradation / Establishment of Lab Schools in GCET’s (Provision of Missing Facilities).
Cost: PKR  533.254 million | Status: Approved | ADP No. 12 (on-going)
 

Health Sector

Upgradation of ICU and Operation Theaters of Nishtar Hospital, Multan.
Cost: PKR  350.000 million | Status: Approved | ADP No. 747 (New)
 

Urban Devlopment Sector

Replacement of Pumping Machinery at Inline Booster Pump Station & Terminal Reservoir in Faisalabad. 
Cost: PKR  1,643.520 million | Status: Approved | ADP No. 2231 (New) 
 
Laying of Forcemain from Bhogiwal Disposal Station Chotta Ravi Drain to Shalimar Escape Channel Across Lahore Ring Road Lahore.
Cost: PKR  368.762 million | Status: Deferred | ADP No. 2221 (New) 
 

PPH Sector

Sewerage scheme Depalpur City, District Okara
Cost: PKR  300.355 million | Status: Approved | ADP No. 1010 (New) 
 

Roads Sector

Widening / Improvement of Byepass Khan Musalman to Jagowala Nowshera Virkan length=17.50 kms, Gujranwala. 
Cost: PKR  459.562 million | Status: Approved | ADP No. 1522 (New) 
 
Construction of Double road from Gujrat-Jalalpur Jattan Road to University of Gujrat length=2.14 kms, Distt Gujrat.
Cost: PKR  263.085 million | Status: Approved | ADP No. 1526 (New) 
 
Widening / Improvement of road from Pirkot Khaliana to Chela to Rajana to Khan Da Kot to Guniana length=45.00 km, Jhang. 
Cost: PKR  555.594 million | Status: Approved | ADP No. 1508 (New) 
 
Improvement of road from Pir Mahal Darkhana Road to Shorkot Cantt Toba Road Via Chak No.321-Gb, 323-GB, 321-GB, 325-GB, 326-GB, length=20.00 km, T.T. Singh. 
Cost: PKR  307.962 million | Status: Approved | ADP No. 1510 (New) 
 
Dualization of Intercity Road in Pir Mahal City, length 2.87 km, Toba Tek Singh.
Cost: PKR  247.374 million | Status: Approved | ADP No. 1511 (New) 
 
Construction of Bridge over River Indus Near Miran Pur on linking N-55 at Arbi Tibba with R.Y. Khan (length:4000 Rft), District R.Y. Khan.
Cost: PKR  2,727.907 million | Status: Deferred | ADP No. 1644 (New) 
 
Widening / Improvement of Palace Road from Pull Dari Sangi to UAE Palace (length: 15.50 km), Distt. R.Y. Khan. 
Cost: PKR  2,623.405 million | Status: Approved | ADP No. 1646 (New) 
 
Construction of Approach Road to Iccha Bangla (length:25.65 km), District R.Y. Khan.
Cost: PKR  1,863.683 million | Status: Deferred  | ADP No. 1643 (New) 
 
Construction & Extension of W/I of Pattan Minara Manthar Road (length:26.25 km), R.Y Khan.
Cost: PKR  398.557 million | Status: Approved | ADP No. 1645 (New) 
 
Widening / Improvement of road from Yazman to Ahmedpur East (length:61.90 km) District Bahawalpur. 
Cost: PKR  2,183.020 million | Status: Deferred | ADP No. 1636 (New) 
 
Widening Improvement of road from Mubarakpur to Jhangara Sharqi (length=25.00 km) in District Bahawalpur. 
Cost: PKR  470.240 million | Status: Approved | ADP No. 1637 (New) 
 
Widening Improvement of road from Iqbalnagar to Dulwan (length=26.10 Km) in District Khanewal.
Cost: PKR  352.412 million | Status: Approved | ADP No. 1608 (New) 
 
Widening / Improvement of Fatehpur to Nawankot Road, length=32.50 Km in District Layyah. 
Cost: PKR  448.21 million | Status: Approved | ADP No. 1631 (New) 
 
Construction of 1st Part of Southern By-Pass Shujabad Multan from River Bank Chenab to Pull Syed Wali Siyalan Wali via Khan Garh Road and Canal Bank towards North Side to connect existing Multan Road, (length=9.20 km) Tehsil Shujabad District Multan. 
Cost: PKR  258.809 million | Status: Approved | ADP No. 1595 (New)