Education Sector |
Up-Gradation / Establishment of Lab Schools in GCET’s (Provision of Missing Facilities). |
Cost: PKR 533.254 million | Status: Approved | ADP No. 12 (on-going) |
Health Sector |
Upgradation of ICU and Operation Theaters of Nishtar Hospital, Multan. |
Cost: PKR 350.000 million | Status: Approved | ADP No. 747 (New) |
Urban Devlopment Sector |
Replacement of Pumping Machinery at Inline Booster Pump Station & Terminal Reservoir in Faisalabad. |
Cost: PKR 1,643.520 million | Status: Approved | ADP No. 2231 (New) |
Laying of Forcemain from Bhogiwal Disposal Station Chotta Ravi Drain to Shalimar Escape Channel Across Lahore Ring Road Lahore. |
Cost: PKR 368.762 million | Status: Deferred | ADP No. 2221 (New) |
PPH Sector |
Sewerage scheme Depalpur City, District Okara |
Cost: PKR 300.355 million | Status: Approved | ADP No. 1010 (New) |
Roads Sector |
Widening / Improvement of Byepass Khan Musalman to Jagowala Nowshera Virkan length=17.50 kms, Gujranwala. |
Cost: PKR 459.562 million | Status: Approved | ADP No. 1522 (New) |
Construction of Double road from Gujrat-Jalalpur Jattan Road to University of Gujrat length=2.14 kms, Distt Gujrat. |
Cost: PKR 263.085 million | Status: Approved | ADP No. 1526 (New) |
Widening / Improvement of road from Pirkot Khaliana to Chela to Rajana to Khan Da Kot to Guniana length=45.00 km, Jhang. |
Cost: PKR 555.594 million | Status: Approved | ADP No. 1508 (New) |
Improvement of road from Pir Mahal Darkhana Road to Shorkot Cantt Toba Road Via Chak No.321-Gb, 323-GB, 321-GB, 325-GB, 326-GB, length=20.00 km, T.T. Singh. |
Cost: PKR 307.962 million | Status: Approved | ADP No. 1510 (New) |
Dualization of Intercity Road in Pir Mahal City, length 2.87 km, Toba Tek Singh. |
Cost: PKR 247.374 million | Status: Approved | ADP No. 1511 (New) |
Construction of Bridge over River Indus Near Miran Pur on linking N-55 at Arbi Tibba with R.Y. Khan (length:4000 Rft), District R.Y. Khan. |
Cost: PKR 2,727.907 million | Status: Deferred | ADP No. 1644 (New) |
Widening / Improvement of Palace Road from Pull Dari Sangi to UAE Palace (length: 15.50 km), Distt. R.Y. Khan. |
Cost: PKR 2,623.405 million | Status: Approved | ADP No. 1646 (New) |
Construction of Approach Road to Iccha Bangla (length:25.65 km), District R.Y. Khan. |
Cost: PKR 1,863.683 million | Status: Deferred | ADP No. 1643 (New) |
Construction & Extension of W/I of Pattan Minara Manthar Road (length:26.25 km), R.Y Khan. |
Cost: PKR 398.557 million | Status: Approved | ADP No. 1645 (New) |
Widening / Improvement of road from Yazman to Ahmedpur East (length:61.90 km) District Bahawalpur. |
Cost: PKR 2,183.020 million | Status: Deferred | ADP No. 1636 (New) |
Widening Improvement of road from Mubarakpur to Jhangara Sharqi (length=25.00 km) in District Bahawalpur. |
Cost: PKR 470.240 million | Status: Approved | ADP No. 1637 (New) |
Widening Improvement of road from Iqbalnagar to Dulwan (length=26.10 Km) in District Khanewal. |
Cost: PKR 352.412 million | Status: Approved | ADP No. 1608 (New) |
Widening / Improvement of Fatehpur to Nawankot Road, length=32.50 Km in District Layyah. |
Cost: PKR 448.21 million | Status: Approved | ADP No. 1631 (New) |
Construction of 1st Part of Southern By-Pass Shujabad Multan from River Bank Chenab to Pull Syed Wali Siyalan Wali via Khan Garh Road and Canal Bank towards North Side to connect existing Multan Road, (length=9.20 km) Tehsil Shujabad District Multan. |
Cost: PKR 258.809 million | Status: Approved | ADP No. 1595 (New) |