17th PDWP

Education Sector

Capacity Building of Elementary Teachers Training Institutions in Punjab (Modified)
Cost: PKR 3,137.752  million | Status: Approved
 

Literacy Sector

Punjab Literacy Movement Project
Cost: PKR 1,824.369  million | Status: Approved | ADP No. 285 (New)
 

Health Sector

Up-Gradation (Reconstruction) District Headquarter Hospital Sargodha
Cost: PKR 1,035.443  million | Status: Approved | ADP No. 385 (on-going)
 
Construction of Lady Willingdon Hospital at Badami Bagh, Lahore
Cost: PKR 2,816.169  million | Status: Deferred
 
Procurement of Contraceptives and General Medicines (July 2013-June 2015)
Cost: PKR 550.000  million | Status: Deferred  | ADP No.  Ex-Agenda                       
 

Urban Development Sector

Feasibility Study for Construction of Water Treatment Plant to Treat the Surface Water Intake from BRB Canal, Lahore. (PC-II)
Cost: PKR 10.00  million | Status: Approved  | ADP No. 1357 (New)
 
Construction of Signal Free Junctions at Qainchi, Ghazi Road and Khaira, Lahore
Cost: PKR 5,145.944  million | Status: Deferred
 
Construction of Signal Free Junctions at Azadi Chowk, Lahore
Cost: PKR 3,834.364  million | Status: Approved
 
Construction of Alternate Route to Circular Road from New Azadi Chowk to Masti Gate
Cost: PKR 1,834.153  million | Status: Approved
 

Agriculture Sector

Engagement of Short Term Consultant to Conduct Feasibility Study for Biomass Power Generation in the Punjab Province (PC-II)
Cost: PKR 6.150  million | Status: Approved  | ADP No. Ex-Agenda
 

PPP Sector

Feasibility Study for the Projects (PC-II):-
(i) Construction of Flyover at Railway Crossing, Defence Road, Lahore (on PPP Basis).         (Cost Rs. 26.900 million).
(ii) Construction of G.T. Road Expressway from Shahdara to Kala Shah Kaku, Lahore
     (on PPP Basis). (Cost Rs.86.800 million).
(iii) Construction of Southern Bypass Lahore (on PPP Basis)(Cost Rs. 26.500 million)
Cost: PKR 140.20  million | Status: Approved  | ADP No. Ex-Agenda
 
Feasibility Study for the Projects (PC-II):-
(iv) Construction of Eastern By-pass, Lahore (Cost Rs. 65.3 million)
(v)  Construction of By-pass from Defence Road (at Multan Road) to Sharqpur (Lahore           Jaranwala Road), Lahore. (Cost Rs. 45.3 million)
Cost: PKR 110.60  million | Status: Deferred  | ADP No. Ex-Agenda