17th PDWP

IT & Governance Sector

Land Records Management and Information Systems Project (Phase-I) (Revised).
Cost: PKR  12,615.199 million | Status: Approved | ADP No. 2412 (on-going)
 

Urban Development Sector

Provision of Arsenic Free Drinking Water for Pilot Projects (Johar Town & Tajpura), Lahore.
Cost: PKR  1,637.370 million | Status: Approved
 
Laying of R.C.C. Conduit Sewer from Shoukat Khanam Hospital Chowk to Sattu Katla Drain, Lahore.
Cost: PKR  1,672.000 million | Status: Approved | ADP No. 2226 (New)
 

Agriculture Sector

Establishment of Punjab Bioenergy Institute, (PBI), Faisalabad.
Cost: PKR  535.803 million | Status: Approved | ADP No. 2289 (New) 
 
Construction of Girls Hostel for 1000 Students at University of Agriculture, Faisalabad.
Cost: PKR  545.693 million | Status: Approved | ADP No. 2290 (New) 
 
Feasibility Study for Establishment of Agriculture Technology Park (PC-II).
Cost: PKR  5.000 million | Status: Approved | ADP No. 2281 (New) 
 
Feasibility Study for Bringing Wastelands of Thal, Pothohar and Cholistan Areas under Cultivation through a Comprehensive Strategy (PC-II).
Cost: PKR  66.000 million | Status: Deferred | ADP No. 2285 (New) 
 

Irrigation Sector

Construction of Flood Protection Works to Protect BRBD Link Canal from RD:285+300 to 300+000/L against the Erosion of River Ravi, District Sheikhupura & Lahore.
Cost: PKR  404.411 million | Status: Approved | ADP No. 1760 (New) 
 
Construction of Tamman Dam, District Chakwal.
Cost: PKR  1,608.275 million | Status: Approved | ADP No. 1750 (New) 
 

Roads Sector

Widening / Improvement of existing road from Kahuta to Lehtrar Link Road via Sang, Tehsil Kahuta District Rawalpindi. 
Cost: PKR  273.767 million | Status: Approved | ADP No. 1476 (New) 
 
Rehabilitation of road from Gujranwala to Kali Suba via Ferozwala Bhoopar km No. 0.00 to 38.54 L=38.54 kms in District Gujranwala.
Cost: PKR  353.615 million | Status: Approved | ADP No. 1521 (New) 
 
Construction of Dual Carriageway Road from Kingra to Sialkot (length=31.50 km), in District Sialkot.
Cost: PKR  1,421.229 million | Status: Approved | ADP No. 1545 (New) 
 
Construction of Overhead Bridge on Railway Level Crossing, Sangla Hill City in District Nankana Sahib.
Cost: PKR  465.408 million | Status: Deferred | ADP No. 1577 (New) 
 
Widening / Improvement of road from Chak No.277/GB to 378/GB, length=20.60 km, District Faisalabad.
Cost: PKR  251.359 million | Status: Approved | ADP No. 2534 (By Allocation) 
 
Widening / Improvement Satiana Road to 258/RB Dijkot More, length=20.20 km, District Faisalabad.
Cost: PKR  251.494 million | Status: Approved | ADP No. 1506 (New) 
 
Dualization of Samundri-Rajana-Toba Tek Singh Road, length=49.00 km, Faisalabad / T.T. Singh.
Cost: PKR  3,142.445 million | Status: Approved | ADP No. 1513 (New) 
 
Widening / Improvement / Repair / Rehabilitation of Road from Mandi Ahmad Abad to Hujra Shah Muqeem via Mala Mukan Ki, Khajoor Wala length=33.43 kms in District Okara.
Cost: PKR  251.323 million | Status: Withdrawn  | ADP No. 1591
 
Widening / Improvement of Lahore Sargodha Mianwali Bannu Road Art: 2 (Phase-II) from Kot Chandna to Dara Tang km No. 354.50 to 408.92 length=54.42 Km in District Mianwali.
Cost: PKR  2,306.472 million | Status: Approved | ADP No. 1501 (New) 
 
Widening / Improvement of Chichawatni-Harappa-Sahiwal-Katchi Pacci Road, length =43.30 km District Sahiwal.
Cost: PKR  719.026 million | Status: Approved | ADP No. 1592 (New)