18th PDWP

PPP Sector

Feasibility regarding Public Private Partnership initiatives for development of Wildlife in Punjab. (PC-II)
Cost: PKR  3.000 million | Status: Approved
 

Environment Sector

Study to Recommend the Most Feasible Option for Treatment of Hudiara Drain Wastewaters (PC-II).
Cost: PKR  21.32 million | Status: Approved | ADP No. 2468 (New)
 
Rationalization, Revision and Development of Environmental Quality Standards, Hazardous Regulations and other Environmental Laws, Rules and Regulations (PC-II).
Cost: PKR  29.000 million | Status: Deferred | ADP No. 2471 (New)
 

Archeology Sector

Capacity Building of Directorate General of Archaeology, Lahore. (PC-II)
Cost: PKR  1.700 million | Status: Approved | ADP No. 2504 (New) 
 

Sports Sector

 
Master Planning, Architectural & Engineering Design and Resident Supervision for New Schemes of Sports Sector (PC-II).
Cost: PKR  93.975 million | Status:  Deferred 
 
Master Planning, Architectural & Engineering Design Multimedia / IT Design and Resident Supervision for E-Libraries in various Playfields and Parks of Punjab (PC-II).
Cost: PKR  17.550 million | Status:  Deferred | ADP No. 531 (New) 
 
Engagement of Consultancy Services Validation of Already Executed Works and Resident Supervision of Balance Works of Sports Sector (PC-II).
Cost: PKR  26.268 million | Status: Deferred
 
Third Party Validation of Works Completed or Executed more than 75 % of Sports Sector (PC-II).
Cost: PKR  19.856 million | Status:  Deferred 
 
Third Party Validation of 100% Completed Projects of Sports Sector (PC-II).
Cost: PKR  9.023 million | Status:  Deferred
 

Literacy Sector

Aao Parhain Project (APP).
Cost: PKR  655.758 million | Status: Approved | ADP No. 423 (New) 
 

Health Sector

Establishment of Pediatric Cancer Unit, Children Hospital, Lahore. 
Cost: PKR 262.784 million | Status: Approved | ADP No. 743 (New)
 
Up-Gradation of DHQ Hospital Narowal (from 125 Beds to 300 Beds).
Cost: PKR  679.535 million | Status: Approved | ADP No. 693 (New)
 
Construction of 60 Bedded THQ Hospital Zafarwal District Narowal.
Cost: PKR  451.655 million | Status: Deferred | ADP No. 566 (New)
 
Extension of Choudhery Parvez Elahi Institute of Cardiology Multan. (Construction of New OPD & Inpatient Block)
Cost: PKR  1,944.526 million | Status: Approved | ADP No. 746 (New)
 

Roads Sector

Rehabilitation of road from Raiwind Phatak to Sui-Asal Upto Ferozepur Road, length=17.47 km, Phase-I (km No.0.00 to 7.62=7.62 km) District Lahore. 
Cost: PKR  256.207 million | Status: Approved | ADP No. 1554 (New) 
 
Widening / Improvement of Road From Madina to Awan Sharif Total length=33.50 kms (in three phases) in District Gujrat.
Cost: PKR  485.650 million | Status: Approved | ADP No. 1527 (New) 
 
Widening / Rehabilitation of Sarwar Shaheed Nishan-e-Haider to Ghousia Chowk Bhatta length=17.37 km Tehsil Gujar Khan District Rawalpindi.
Cost: PKR  267.505 million | Status: Approved | ADP No. 1478 (New) 
 
Construction of road from Seela Sayydan to Kotli Sattian Via Bheer Gala L=31.60 km Tehsil Kotli Sattian District Rawalpindi. 
Cost: PKR  264.703 million | Status: Deferred | ADP No. 1480 (New) 
 
Construction of road from Bhatiot to Village Nawa length=12 km, District Attock.
Cost: PKR  302.368 million | Status: Approved | ADP No. 1484 (By Allocation) 
 
Construction of New Bhoun Bye Pass L=11 km District Chakwal.
Cost: PKR  282.797 million | Status: Deferred | ADP No. 1490 (New) 
 
Widening / Improvement of road from Ouderwal to Nila Road length=43.00 km District Chakwal.
Cost: PKR  545.989 million | Status: Approved | ADP No. 1492 (New) 
 
Widening / Improvement / Construction of road from Laksian Pull at Km No. 130 of Lahore Sargodha Bannu Road to Lilliani Via Jala Makhdoom, Ghous Muhammad Wala, Miana Khoh, Matila, Chak No. 67/SB length 36.25 km in District Sargodha.
Cost: PKR  843.112 million | Status: Approved | ADP No. 1497
 
Repair of road from Faisalabad to Lahore Road Along-With Canal Bank length 28.47 km District Sargodha. 
Cost: PKR  631.456 million | Status: Deferred | ADP No. 1496 (New) 
 

Agriculture Sector

 
Feasibility Study for bringing Wastelands of Thal, Pothohar and Cholistan Areas under Cultivation through a Comprehensive Strategy.
Cost: PKR  39.983 million | Status: Approved | ADP No. 2285 (New)  (Ex-agenda)
 
Management of Fruit Fly with Special Reference to Non-Conventional Methods.
Cost: PKR  275.000 million | Status: Approved | ADP No. 2284 (New)  (Ex-agenda)