1st PDWP

Roads Sector

Widening / Improvement of Narowal-Shakargarh Road km No. 0/0 to 40/24 (length=40.24 km) in District Narowal. (Revised)
Cost: PKR  856.988 million | Status: Deferred | ADP No.1273 (on-going)
 
Dualization of Muridke Narowal Road from 0.00 to 41.50 km in District Sheikhupura length=41.50 km District Sheikhupura. (Revised)
Cost: PKR  2,723.989 million | Status: Deferred | ADP No.1304 (on-going)
 
Widening / Improvement of Road Sheikhupura Sargodha Road km No. 37 to 49.56 to 61.30 and 71.60 to 83.30 length=20.90 km in District Sheikhupura. (Revised)
Cost: PKR  1,120.919 million | Status: Deferred | ADP No.1303 (on-going)
 
Widening / Improvement of road from Faisalabad By-Pass Km No.13 (Makuana) to Jassuana Via Chak No. 113./GB, 111/GB and 69/GB, length 17.03 Km, District Faisalabad
Cost: PKR  240.087 million | Status: Approved | ADP No.1244 (on-going)
 
Construction of Bridge Saroba Tehsil and District Rawalpindi. (Revised)
Cost: PKR  299.645 million | Status: Approved
 
Widening / Improvement of Kahuta Karot Road via Khalool L=31.17 km District Rawalpindi (Revised)
Cost: PKR  565.334 million | Status: Approved | ADP No.1199 (on-going)
 
Widening / Improvement of Okara Marripattan Road length=29.36 Kms in District Okara
Cost: PKR  892.414 million | Status: Approved | ADP No.1315 (on-going)