21st PDWP

Agriculture Sector

Engagement of Short Term Consultant to Conduct Feasibility Study for Biomass Power Generation in the Punjab Province. (PC-II)
Cost: PKR 6.30 million | Status: Approved
 

Health Sector

Establishment of Ghazi Khan Medical College at Dera Ghazi Khan. (Revised)
Cost: PKR 1,443.837 million | Status: Approved | ADP No. 435 (on-going)
 

Public Building Sector

Reconstruction / Rehabilitation of Damaged shops Masjid and Madrassa Taleem ul Quran in Raja Bazar Rawalpindi
Cost: PKR 315.020 million | Status: Approved
 

Roads Sector

Dualization of Gujranwala Sialkot Road (section Gujranwala to Daska L=21.87 km) in District Gujranwala & Sialkot (3rd Revised)
Cost: PKR 2,082.252 million | Status: Approved | ADP No. 760 (on-going)
 
Dualization of Gujranwala - Sialkot Road (Section Daska to Sialkot L = 25.73 km) in District Sialkot (5th Revised)
Cost: PKR 3,079.993 million | Status: Approved | ADP No. 784 (on-going)
 
Duailization of Sheikhupura Gujranwala Road length 54.33 km in District Sheikhupura and Gujranwala
i.      Section from km 3.90 To 14.65 length 10.75 km in District Sheikhupura
ii.     Section from km 14.65 To 48.70 length 34.05 km in District Gujranwala
Cost: PKR 4,368.530 million | Status: Deferred | ADP No. 909 (New)
 
Dualization of Lahore-Jaranwala-Faisalabad-Jhang-Bhakkar Raod (Section Buchekee to Jaranwala km No. 81.47 to 103) length 21.53 km, District Faisalabad. (Revised)
Cost: PKR 641.728 million | Status: Approved | ADP No. 743 (on-going)
 
Re-habilitation of road from Bansra Gali to Lawarance College to Jhika Gali length = 9.35 Kms
Cost: PKR 443.006 million | Status: Deferred | ADP No. 882 (New)
 
Re-habilitation of road from Lower Topa (Danna) to Gulehra Gali to Patriata Top length = 17.00 Kms
Cost: PKR 270.916 million | Status: Approved | ADP No. 881 (New)
 
Dualization of Khushab Muzaffargarh Road from Railway Crossing to Khanpur Bagga Sher (Balance Length) from km No: 287.55 to 292.00 length=4.45 km
Cost: PKR 218.101 million | Status: Deferred  | ADP No. 906 (New)
 
Widening / Improvement of Pattoki to Kanganpur Road length=54.10 kms in District Okara
Cost: PKR 975.333 million | Status: Approved  | ADP No. Ex-Agenda 822
 

P&D/RP Sector

Concept paper for clearance from PDWP for revamping of the office of directorate General (M&E),P&D Department
Cost: PKR 80.360 million | Status: Approved  | ADP No. Ex-Agenda