22nd PDWP

Education Sector

Acquisition of 1604-K&10-M Land for Establishment of Narowal Campus of University of Engineering & Technology, Lahore, District Narowal
Cost: PKR 296.182 million | Status: Approved
 
Provision of Laptops
Cost: PKR 1000.00 million | Status: Approved | ADP No. Ex-agenda
 

Health Sector

Establishment of 60 Bedded THQ Hospital at Raiwind Lahore
Cost: PKR 345.008 million | Status: Approved
 
Establishment of I.C.U. at B.V. Hospital Bahawalpur. (Revised)
Cost: PKR 275.522 million | Status: Approved | ADP No. 422 (on-going)
 

Irrigation Sector

Enhancing the Capacity of Charrar Drain to Cater for Rain Water of Ring Road (Package-A&B), Lahore. (Revised)
Cost: PKR 542.504 million | Status: Deferred | ADP No. 930 (on-going)
 
Establishment of Strategic Planning / Reform Unit in Irrigation Department. (PC-II)
Cost: PKR 138.345 million | Status: Approved | ADP No. 913 (on-going)
 

PPH Sector

Comprehensive Water Supply & Sewerage Scheme Mianwali
Cost: PKR 431.646 million | Status: Approved | ADP No. 489 (on-going)
 
Comprehensive Urban Water Supply & Sewerage Scheme District Headquarter Jauharabad District Khushab
Cost: PKR 479.335 million | Status: Approved | ADP No. 488 (on-going)
 
Comprehensive Urban Water Supply & Sewerage Scheme Khushab
Cost: PKR 314.591 million | Status: Approved | ADP No. 487 (on-going)
 

Roads Sector

Construction of Additional Bridge over River Ravi (4-Lane), Lahore
Cost: PKR 882.615 million | Status: Deferred | ADP No. 898 (New)
 
Widening / Improvement of THAT pail road km 165.75 to 193.20 i/c Talagang Byepass L=3.80 km total length=32.21 km District Chakwal
Cost: PKR 858.826 million | Status: Approved
 
Dualization of Khushab Muzaffargarh Road from Railway Crossing to Khanpur Bagga Sher (Balance Length) from km No: 287.55 to 292.00 length=4.45 km
Cost: PKR 218.101 million | Status: Approved | ADP No. 906 (New)