22nd PDWP

Roads Sector

Treatment of Dewal Land slide on Rawalpindi Murree Kashmir road km=56, District Rawalpindi (Revised) 
Cost: PKR  230.757 million | Status: Deferred | ADP No. 1198 (On-Going)
 
Widening / Improvement of road from Misri More to Khewra via P.D. Khan length 52.78 km District Jhelum. 
Cost: PKR  1,209.307 million | Status: Approved | ADP No. 1220 (On-Going)
 

Irrigation Sector

Construction of Mahota Dam, Rawalpindi.
Cost: PKR  1,861.985 million | Status: Deferred | ADP No. 1748 (New)
 
Concrete Lining of Maggi-Magasson Link RD 0-58500 in Basira Sub Division, Muzaffargarh. 
Cost: PKR  489.831 million | Status: Approved | ADP No. 1733 (New) 
 
Rehabilitation of Ahmadpur Lamma Disty System, Rahimyar Khan.
Cost: PKR  1,148.96 million | Status: Approved | ADP No. 1737 (New) 
 
Rehabilitation of Jatoi Branch from RD:0+000 to RD:140+000 (Tail), Muzaffargarh. 
Cost: PKR  496.396 million | Status: Approved | ADP No. 1735 (New) 
 
Checking Erosive Action of Chenab River on Left Bank Near Gangwal, Papin Village  U/S of Marala Barrage, Sialkot.
Cost: PKR  365.424 million | Status:  Approved
 
Raising of Shahpur Dam (Phase-I), Attock. 
Cost: PKR  261.174 million | Status: Approved | ADP No. 1747 (New) 
 
Management of Hill Torrents in Irrigation Zone, D.G. Khan-Sori Lund, Vidore, Mithawan, Kaha & Chachar (Sori Lund Hill Torrent).
Cost: PKR  2,060.487 million | Status:  Approved | ADP No. 1762 (New) 
 
Strengthening Field Research Station (FRS) at Babakwal and Research Laboratories of Irrigation Research Institute, Lahore Introducing Numerical Modeling of Hydraulic Structures. 
Cost: PKR  561.294 million | Status:  Approved | ADP No. 1721 (New) 
 
Rehabilitation / Concrete Lining of Sharqpur Disty System (Sharqpur Disty, Jodkhke Minor, Tashpur Sub Minor & Mundi Sub Minor), District Nankana Sahib.
Cost: PKR  853.390 million | Status:  Deferred | ADP No. 1739 (New)