Confirmation of Minutes of the 78th PDWP meeting dated 23.06.2017
Discussed
UD SECTOR
Preparation of Feasibility Study and Detailed Engineering Design Regarding Sewerage & Drainage System for Abadies Located along Charrar Drain, Lahore. (PC-II)
Cost: PKR 33.887 million| Status: Approved
LG SECTOR
Construction of New Office Building of Union Councils in the Punjab.
Cost: PKR 8443.600 million| Status: Approved
PPH SECTOR
Multi Sectoral Nutrition Strategy for WASH including Water Supply, Sanitation, Hygiene, Wastewater Treatment Disposal of Solid Waste (10 Villages of Brackish / Barani Districts with Minimum Population of 5000 Persons one from Each Civil Division)
Cost: PKR 914.727 million| Status: Approved
Bulk Water Supply from River Jhelum to Murree (Revised).
Cost: PKR 8052.000 million| Status: Deferred