30th PDWP

Health Sector

Upgradation of Thalassemia Unit and Bone Marrow Transplant center at B.V. Hospital Bahawalpur. (Revised)
Cost: PKR 908.632 million | Status: Approved | ADP No. 466 (on-going)
 

Agriculture Sector

Supply Chain Improvement of Selected Agriculture and Livestock Products
Cost: PKR 2,321.748 million | Status: Deferred | ADP No. 1372 (on-going)
 
Enhancing Vegetable Production in Punjab
Cost: PKR 410.870 million | Status: Approved
 

Urban Development Sector

Replacement of Outlived, Deeper and Inadequate Water Supply Lines in WASA, Lahore (Gastro Phase-II)
Cost: PKR 1,917.65 million | Status: Approved | ADP No. 1355 (New)
 
Construction of Leftover (SPBUSP) Works of Sullage Carrier from Bosan Road Disposal Station to Sewage Treatment Plant (STP) at Suraj Miani and STP to River Chenab, Multan. (Revised)
Cost: PKR 541.890 million | Status: Approved
 

Regional Planning (SPDP) Sector

Construction of Express Way from Shujabad to Nag Shah L=26.15 km District Multan
Cost: PKR 1,760.125 million | Status: Approved | ADP No. B. Allocation SPDP 681 (New)
 
Widening / Improvement of Bosan Road (from BZU to Adda Sahi Chawan length=21.00 km in District Multan
Cost: PKR 436.955 million | Status: Deferred | ADP No. B. Allocation SPDP 681 (New)
 
Construction of Bypass at Kehror Pacca length=12.50 km in District Lodhran
Cost: PKR 292.114 million | Status: Approved | ADP No. B. Allocation SPDP 681 (New)
 
Widening / Improvement of Tibba Sultan Pur-Mailsi Road length:35.00 km in District Vehari
Cost: PKR 980.213 million | Status: Approved | ADP No. B. Allocation SPDP 681 (New)
 
Widening / Improvement of road DM Road to District boundary Khanewal (length: 21.70 km) in District Vehari
Cost: PKR 288.103 million | Status: Approved | ADP No. B. Allocation SPDP 681 (New)
 

R&B Sector

Widening / Improvement of Lahore Sargodha Mianwali Banuu Road Art:2 km No. 297.80 to 346.58=48.78 km & Jinnah Barrage Link Road (length 7.71(-)2.20=5.51 km) total length=54.29 km in District Mianwali
Cost: PKR 2,018.138 million | Status: Approved
 
Widening / Improvement of road from Adda Jahan Khan to Kotala Jam Via 36 Wala Khokha & Samlan Wala Morr (length=21.00 km) in District Bhakkar
Cost: PKR 242.505 million | Status: Approved | ADP No. 739 (on-going)
 
Rehabilitation / Improvement of Muridke-Narowal Road km No.42/0 to 75/21 (length=33.21 km) in District Narowal (Dualization of Road)
Cost: PKR 1,586.125 million | Status: Approved | ADP No. 796 (on-going)
 
Construction / Widening of road from Lahore Ferozepur Road Kahna to Halloki along both sides of Butcher Khana Distributary (length=8.50 km) (Revised)
Cost: PKR 893.365 million | Status: Approved | ADP No. 797 (on-going)
 
Rehabilitation /Improvement Lawrence College Jhika Gali Bye Pass Road length = 9.35 km, District Raw/pidi
Cost: PKR 412.814 million | Status: Approved | ADP No. 882 (New)