33rd PDWP

Irrigation Sector

Protecting Irrigation System near Head Regulator Bakaini, Area of Bait Daryai and Gabar Arain from Hectic Erosive Action of Indus River. (Revised)
Cost: PKR 535.472 million | Status: Approved
 

Health Sector

Up-Gradation of DHQ, Hospital Bahawalnagar
Cost: PKR 434.667 million | Status: Approved | ADP No. 467 (New)          
 
Construction / Expansion of 150 Bedded Wards (New Block) for Provision of Sub-Specialist Services at Children Hospital Complex, Multan
Cost: PKR 1,855.791 million | Status: Approved | ADP No. 412 (on-going)
 

Regional Planning (SPDP) Sector

Construction of General Bus Stand Rahim Yar Khan
Cost: PKR 203.24 million | Status: Withdrawn/ not discussed | ADP No. B. Allocation SPDP 681 (New)
 

Roads Sector

Lahore Ring Road Project (Package-6) Construction of road portion from Barki Road Intersection to Ghazi Road Intersection. (Revised)
Cost: PKR 3,136.670 million | Status: Approved
 
Dualization of Muridke Narowal Road from 0.00 to 41.5 km in District Sheikhupura length 441.50 km
Cost: PKR 2,621.534 million | Status: Approved | ADP No. 813 (on-going)
 
Construction of Eastern Bypass (length=7.32 km) Phase-I, in District Sialkot
Cost: PKR 314.545 million | Status: Approved | ADP No. 791 (on-going)
 
Dualization of T.H.A.T Road from Jahanian Chowk to Hattian Via Motorway Interchange in District Attock length=17.6 km
Cost: PKR 698.819 million | Status: Approved | ADP No. 716 (on-going)
 

Transport Sector

Construction of Metro Bus Transit System for Lahore-Ferozepur Road Corridor, Package-I (from Youhanabad to Kalma Chowk length=10.0 km) (Revised)
Cost: PKR 7,442.234 million | Status: Approved
 
Construction of Bus Rapid Transit System along Ferozepur Road, Package-III: Qartaba Chowk to M.A.O College (Elevated Section-2.5 km).(Revised)
Cost: PKR 6,244.924 million | Status: Withdrawn/ not discussed
 
Metro Bus Transit System for Lahore-Ferozepur Road Corridor, Package-V: Construction of MTS from Taxali Chowk to Shahdara Mor length-3.3 km. (Revised)
Cost: PKR 2,699.479 million | Status: Approved
 
Construction of Bus Rapid Transit System for Lahore-Ferozepur Road Corridor, Package-VII:Construction of Additional Bridge along Lahore Bridge. (Revised)
Cost: PKR 921.061 million | Status: Approved
 
Extension in gestation period of scheme Feasibility study for BRT corridor for Lahore
Cost: PKR Issue million | Status: Cleared
 

Livestock Sector

Livestock and Access to Markets Project (LAMP)
Cost: PKR 4,369.000 million | Status: Approved | ADP No. Ex-Agenda