37th PDWP

EDUCATION SECTOR

Establishment of Cadet College Khanpur, R.Y. Khan.

Cost: PKR 417.235 million | Status: Deferred

PUBLIC BUILDINGS SECTOR

Construction of Examination Halls at Johar Town, Lahore.

Cost: PKR 522.225 million | Status: Deferred

ROADS SECTOR

Establishment of Flyover across Railway Track in Raiwind City, Lahore.

Cost: PKR 1047.034 million | Status: Approved

Repair / Rehabilitation of road from Sillanwali to Chak No. 58/Janubi via 119 More, 126/SB length 39.80 Km District Sargodha. (Revised)

Cost: PKR 1020.494 million | Status: Deferred

Widening / Improvement of Palace Road from Pull Dari Sangi to UAE Palace length: 12.00 Km (Revised) 

Cost: PKR 938.024 million | Status: Approved

Construction of Bridge over River Indus Near Miran Pur on linking N-55 at Arbi Tibba with R.Y. Khan (length:4000 Rft), R.Y. Khan. (Revised)

Cost: PKR 3951.392 million | Status: Withdrawn

HEALTH SECTOR

Upgradation ICU & Operation Theaters at Allied Hospital, Faisalabad. (Revised)

Cost: PKR 335.533 million | Status: Approved

Establishment of I.C.U. at B.V. Hospital Bahawalpur. (Revised)

Cost: PKR 319.119 million | Status: Approved