I&C Sector |
||||
Re-Designing and Up-Gradation of Under-Construction Building of Murree Arts Council, Murree. (PC-II) | ||||
Cost: PKR 7.00 million | Status: Approved | ADP No. 1493 (on-going) | ||||
Health Sector |
||||
Establishment of 60 Bedded Hospital at Sabzazar Scheme Lahore
|
||||
|
||||
Provision of Missing Specialties for Upgradation Of DHQ Hospitals (AIMH & GSBH Sialkot) to Teaching Hospitals
|
||||
|
||||
District Programme Sector |
||||
Survey, Soil Investigation and Detail Architectural / Structural Designing of Construction of Parking Plazas with Shopping Malls at, Faisalabad. (PC-II)
|
||||
|
||||
Construction of Canal Express Way from Gatt Wala Bridge to Sahian Wala (M-3) Interchange, Faisalabad (length=24.50 km)
|
||||
|
||||
Transport Sector |
||||
Construction of Metro Bus Transit System for Lahore-Ferozepur Road Corridor, Package-II Construction of MTS From Kalma Chowk to Qartaba Chowk (Elevated Section) length: 4.9 km. (Revised)
|
||||
|
||||
Complete Repair and Renovation of Sewerage System Including PCC.Drains, Water Channels, Soling, Tuff Tiles Etc in Basirpur, District Okara
|
||||
|
||||
RP/SPDP Sector |
||||
Sewerage Scheme Chishtian (City Uplift Package Chishtian) District Bahawalnagar
|
||||
|
||||
Dualization and Beautification of Mianwali Muzaffargarh Road passing through Chowk Munda from km No. 226.50 to 229.50 length 3.00 km District Muzaffargarh.
|
||||
|
||||
Roads Sector |
||||
Construction of Southern Bye Pass Muzaffargarh-Alipur Road to Dera Ghazi Khan Road (N-70) length=9.25 km District Muzaffargarh.
|
||||
|
||||
Lahore Ring Road (Package-10) Construction of Interchange at G.T. Road. (Revised)
|
||||
|
||||
Lahore Ring Road Construction of road Portion from Niazi Chowk to Mehmood Booti (Package-3) (2nd Revised)
|
||||
|
||||
Lahore Ring Road (Package 11A) Widening / Improvement of Ghazi Road from Package-11 of LRRP to Rehman Villas including Improvement of Bhatta Chowk
|
||||
Cost: PKR 213.106 million | Status: Approved | ||||
Lahore Ring Road Construction of Link to G.T. Road at Daroghawala (Package-13A) (Revised)
|
||||
|
||||
Lahore Ring Road Construction of Interchange at Bedian Road (length=1.40 km) (4th Revised) (Package-15)
|
||||
Cost: PKR 2,185.002 million | Status: Approved | ||||
Lahore Ring Road Construction of road portion from Bedian Road Intersection to Khaira Distributary (2nd Revised) (Package-16)
|
||||
Cost: PKR 868.202 million | Status: Approved | ||||
Lahore Ring Road Construction of road along Khaira Distributary from Package 17 to Ferozepur Road (length=3.16 km) (2nd Revised)
|
||||
|
||||
UD Sector |
||||
Construction of Kasur By-Pass Connecting Ferozepur Road with Depalpur Road (length 9.6 Km)
|
||||
|
||||
Construction of Kasur Sports Complex, Khem Karan Road, Kasur
|
||||
|
||||
Construction – Improvement of Maulana Shaukat Ali Road to Multan Road via Kareem Block Market
|
||||
|
||||
Widening and Improvement of Main Road Sheikhupura
|
||||
Cost: PKR 2,444.498 million | Status: Approved | ||||
Construction of Link Connecting Motorway at Shahpur Kanjran to Raiwind Road and Khayaban-e-Jinnah, Lahore
|
||||
Cost: PKR 2,314.570 million | Status: Approved | ||||
Construction of Underpass at Sheikhupura Gujranwala Road and Sheikhupura Hafizabad Road, Sheikhupura
|
||||
Cost: PKR 892.50 million | Status: Approved
|
||||