40th PDWP

URBAN DEV. SECTOR

Construction of Kasur Sports Complex, Khem Karan Road, Kasur (Revised)   

Cost: PKR 468.973 million | Status:     Approved

Area Development Scheme No.II, Sheikhupura.

Cost: PKR 457.162 million | Status:     Approved

ROADS SECTOR

Widening / Improvement of metalled road from Lahore Sheikhupura Road km No.29 Adda Joinwala More to Sheikhupura Muridke Road i/c Link to Punjab Apparel Park, District Sheikhupura length=13.65 km. (Revised)

Cost: PKR 656.911 million | Status:     Approved

Widening / Improvement of road from 355/GB to 278/GB via 356/GB, 357/GB, 280/GB, 283/GB, Mandi Roadala 283/GB Sammundar 279/GB, Faisalabad, length=21.75 km (KPRRP Phase-III)

Cost: PKR 294.636 million | Status:     Approved

Widening / Improvement of road from Chak No. 47/RB to 153/RB Via 137/RB, 139/RB, 139/RB, 143/RB, 146/RB, Faisalabad, length=25.10 Km (KPRRP Phase-III)

Cost: PKR 265.507 million | Status:     Approved

Widening / Improvement / Construction of Sangla Hill Pindorian Road to Ghullay Bajwa Chowk via Dera Jaat, Hanjli, Ramoana, Ladhar and 116 RB (length 16.60 km), Nankana Sahib.

Cost: PKR 215.013 million | Status:     Approved

Widening / Improvement / Construction of Shahkot-Safdarabad Road to Nizampura, Roriana to Sangla Hill Safdarabad Road Marh Balochan (length 20.60 km), Nankana Sahib.

Cost: PKR 234.832 million | Status:     Approved

Rehabilitation / Repair of Metalled Road from Kot Sultan to MM Road length=35.50 km, District Layyah. (KPRRP, Phase-III)

Cost: PKR 305.630 million | Status:     Approved

Rehabilitation, Widening / Improvement of road from Khokar Kothi Lakhan Jhedu to Lakhan Link with Bama Bala Kohla Road via Chuchak Mupalkay and Bama Zareen length=24.40 kms, Tehsil Renala Khurd District Okara. (KPRRP, Phase-III)

Cost: PKR 221.497 million | Status: Approved

Rehabilitation / Widening (10’ to 12ft) of road from Choti Zareen to Choti Bala length=24 km, D.G. Khan.

Cost: PKR 355.475 million | Status: Approved

Rehabilitation of Metalled Road from Adda Lal Sohanra to Kudwala (36.75 km), Bahawalpur.

Cost: PKR 349.207 million | Status: Approved