Irrigation Sector |
Providing Drainage System in Command Area of 3-R Abbasia Canal, District R.Y. Khan (Revised) |
Cost: PKR 745.690 million | Status: Cleared | ADP No.933(on-going) |
PPH Sector |
Water Supply Scheme Sadiqabad, Tehsil Sadiqabad District Rahim Yar Khan |
Cost: PKR 711.538 million | Status: Approved |
Water Supply Scheme for Adiala and Chakri Road Tehsil & District Rawalpindi. (Concept Clearance Paper) |
Cost: PKR 996.030 million | Status: Approved |
Health Sector |
Establishment of 60 Bedded Tehsil Level Hospital at Lidher, Bedian Road, Lahore |
Cost: PKR 335.602 million | Status: Withdrawn | ADP No.368(on-going) |
Establishment of DHQ Hospital, Multan |
Cost: PKR 1,126.647 million | Status: Approved | ADP No.451(New) |
Agriculture Sector |
Engagement of Short Term Consultant to Conduct Feasibility Study for Biomass Power Generation in the Punjab Province (on Fast Track Basis) (PC-II) |
Cost: PKR 9.600 million | Status: Withdrawn/not discussed |
Energy Sector |
Hiring of Consultants for Review Updation of Request for Proposal (RFP) for Selection of Sponsors (s) for 120 MW Taunsa Hydropower Project (PC-II) |
Cost: PKR 11.398 million | Status: Not discussed | ADP No.978 (New) |
2x55 MW Imported Coal Fired Power Projects at M-3 Industrial City Faisalabad.(Concept Clearance Paper) |
Cost: US$ 150 million million | Status: Not discussed |
2x55 MW Imported Coal Fired Power Projects at Sundar Industrial Estate Lahore.(Concept Clearance Paper) |
Cost: US$ 150 million million | Status: Not discussed |
Roads Sector |
Improvement / Rehabilitation of Existing Multan Road, Lahore from Thokar Niaz Baig to Chauburji, Phase-II, Section-3: Scheme Mor to Chauburji length: 3.5 km Package-II (Roads Works) |
Cost: PKR 790.711 million | Status: Approved |
Widening / Improvement of Gujranwala Pasrur Road km No. 0.00 to 46.00 (length=46.00 Km) in District Gujranwala and Sialkot |
Cost: PKR 1,157.025 million | Status: Approved | ADP No.875 (on-going) |
Widening / Improvement Khushab Muzaffargarh Road (Section Jhang District Boundary to Muzaffargarh) from km No. 207.72 to 291.00 length=83.82 km District Muzaffargarh |
Cost: PKR 2,223.139 million | Status: Approved | ADP No.846 (on-going) |
Widening / Improvement of road from Rangpur Chowk Munda Daira Din Pannah to Taunsa More up to Pull Qamber, length=72.50 kms in District Muzaffargarh (Revised) |
Cost: PKR 661.750 million | Status: Approved | ADP No.845 (on-going) |
Construction of Road & Bridge between District Mianwali & Jand (District Attock) |
Cost: PKR 2,164.294 million | Status: Deferred | ADP No.715 (on-going) |
W/I of road from Chishtian-Dharanwala-Fortabbas Road legnth:43.00 km District Bahawalnagar |
Cost: PKR 561.978 million | Status: Approved | ADP No.865 (on-going) |
Construction of High Level Bridge over River Jhelum at Langarwala Pattan to Sahiwal in Sargodha & Khushab District |
Cost: PKR 1,906.776 million | Status: Approved |
Lahore Ring Road (Package-17) Construction of Interchange at Khaira Distributory |
Cost: PKR 1,612.219 million | Status: Approved | ADP No.805 (on-going) |