42nd PDWP

ROADS SECTOR                                            

Construction of Bridge over Nullah Besentar near Village Nadala on Noor Kot (Mangri Qila Ahmed Abad Road) to Shah Ghareeb Road i/c Rehab. / Imp. of road from Noor Kot to Nadala (length=9.40 km), and Widening / Imp. of road Remaining Portion Nadala Bridge to Essa Chowk to Mangra i/c approach to Fatowal (length=7.70 km), District Narowal. (Revised)

Cost: PKR 306.509 million | Status:     Approved

Construction of Flyover at Sublime Chowk on Sialkot-Wazirabad Road, District Sialkot.

Cost: PKR 991.727 million | Status:     Approved

Rehabilitation of road from Lower Topa (Danna) to Gulehra Gali to Patriata Top length=17 kms / i/c Rain / Flood Damages, Rawalpindi.

Cost: PKR 327.298 million | Status:     Approved

Construction of Mandra Chakwal Road to Rawat Chakbeli Road via Pind Bala Paimal, length=9.22 km, Rawalpindi. (KPRRP Phase-II)

Cost: PKR 467.735 million | Status:     Approved

Widening / Improvement of road from Kallar Kahar to Choa Saiden Shah length=30.50 km, District Chakwal.

Cost: PKR 679.751 million | Status:     Approved