Archeology Sector |
Extension of Gestation period of the ADP scheme “Survey, Documentation and Preparation of Master Plan for Development & Conservation of Historical Town of Satgarh” District Okara |
Cost: Issue | Status: Cleared |
PPH Sector |
Urban Water Supply Scheme Shahkot District Nankana Sahib (3rd Revised) |
Cost: PKR 217.491 million | Status: Deferred |
Health Sector |
Upgradation of DHQ Hospital Sahiwal (Provision of Missing Specialties) as A Teaching Hospital, Sahiwal |
Cost: PKR 3,638.910 million | Status: Approved |ADP No.411 (New) |
Up-gradation of DHQ Hospital Okara.
A.Cardiology ward 25-beds with CCU-ward 05 beds
B.Neuro Surgery Ward of 20-Beds along with C.T. Scan
|
Cost: PKR 295.153 million | Status: Deferred |ADP No.376 (on-going) |
Industries Sector |
Registration of Geographical Indications
|
Cost: PKR 99.55 million | Status: Approved |ADP No.1425 |
Engagement of Consultant for Islamic Development Bank’s (IDB) Assistance for Government of Punjab Interest Free Self Employment Scheme. (PC-II) |
Cost: PKR 4.500 million | Status: Approved |
Irrigation Sector |
Feasibility Study of A Pilot Project for Inland Waterways Transport (IWT) in Punjab for the Pilot Reach between Daudkhel to Attock (PC-II) |
Cost: PKR 60.000 million | Status: Approved |
Lining of Bucherkahana Disty RD 66+500 to 225+475 Tail, Lahore |
Cost: PKR 557.59 million | Status: Approved |
Construction of Side Drain (6 Km) along M.R. Link from RD:296+000 to RD:314+000 having capacity of 3000 CS, District Narowal / Sheikhupura |
Cost: PKR 312.776 million | Status: Deferred |
Enhancing the Capacity of Charrar Drain to Cater for Rain Water of Ring Road (Package-A&B) (Revised) |
Cost: PKR 491.809 million | Status: Deferred | ADP No.930 (on-going) |
Flood Protection of Hill Torrents in Jampur (District Rajanpur) |
Cost: PKR 3,437.179 million | Status: Deferred | ADP No.966 (on-going) |
Roads Sector |
Lahore Ring Road (Package-07) Construction of Interchange at Airport Access Road |
Cost: PKR 2,985.675 million | Status: Approved |
Construction of Flyover on G.T. Road in Gujranwala |
Cost: PKR 3,938.464 million | Status: Approved | ADP No.865 (on-going) |
Construction of road on Empress Bund from National Highway N-5 (km No.844) near Highway Bridge Over River Sutlej towards Lashkar Di Goth in Km No. 6 of Jhangiwala Road in District Bahawalpur (length:9.30 km) District Bahawalpur. (Revised) |
Cost: PKR 643.753 million | Status: Approved | ADP No.858 (on-going) |
Widening / Improvement of road from Hasilpur to Bahawalnagar (length:80.00 Km) District Bahawalpur / Bahawalnagar |
Cost: PKR 1,986.441 million | Status: Approved | ADP No.863 (on-going) |
Widening / Improvement / Construction of road from 18-Hazari to Fatehpur, Length 94.00 km in District Jhang / Layyah. (Revised) |
Cost: PKR 993.079 million | Status: Approved | ADP No.876 (on-going) |
Widening / Improvement of road from Mianwal Ranjha to Saida via Qadirabad length=17.00 kms District Mandi Bahauddin |
Cost: PKR 222.789 million | Status: Approved |