Roads Sector |
Improvement / Rehabilitation of Existing Multan Road, Lahore from Chauburji to Thokar Niaz Baig, length=11.20 Km, Lahore. |
Cost: PKR 311.000 million | Status: Approved |
Construction of road from Narowal to Lahore via Baddomalhi-Narang-Kala Khatai Shahdara (length=42.71 km) District Narowal / Sheikhupura (Revised). |
Cost: PKR 697.626 million | Status: Approved | ADP No. 1272 (on-going) |
Widening / Improvement of Mianwali Muzaffargarh road from Km#229.80 to 278.36 length 48.56 Km (section chowk Sarwar Shaheed to T.P. link Canal & T.P. link Canal to Muzaffargarh) (Revised). |
Cost: PKR 1032.896 million | Status: Approved | ADP No. 1334 (on-going) |
Public Building Sector |
Feasibility Study and Design for Development of Surface Parking at Chitta More Murree (also for Parking Facilities at General Bus Stand, Lower Topa, Bansara Gali and IDMC-I)-Feasibility Study (Phase-I) (3rd Revised PC-II) |
Cost: PKR 70.772 million | Status: Deferred | ADP No. 2152 (on-going) |
Livestock Sector |
Establishment of University of Veterinary and Animal Sciences at Bahawalpur. |
Cost: PKR 2350.000 million | Status: Approved | ADP No. 2363 (New) |
PPH Sector |
Installation of New Water Supply Scheme for the Residents of Fateh Jang City Tehsil Fateh Jang District Attock. |
Cost: PKR 420.441 million | Status: Approved | ADP No.988 (New) |
Irrigation Sector |
Feasibility Study for Raising of Rawal Dam (PC-II). |
Cost: PKR 38.059 million | Status: Approved | ADP No.1713 (New) |
Feasibility Study of Qutib Bandi Dam Site (PC-II). |
Cost: PKR 39. 507 million | Status: Approved | ADP No.1715 (New) |
Feasibility Study of Thatha Dam Project (PC-II). |
Cost: PKR 43.844 million | Status: Approved | ADP No.1712 (New) |
Lining of Thamman Disty RD 0+000 to 97+960 Tail, District Kasur. |
Cost: PKR 318.550 million | Status: Approved |
Rehabilitation and Improvement of Existing Dams and Irrigation Channels in Small Dams Organization. |
Cost: PKR 732.017 million | Status: Approved | ADP No.1691 (on-going) |
Hiring of Design Review, Monitoring, Reporting, and Construction Supervision Consultants for Mega Irrigation Projects, in the Irrigation Department, Punjab, (PC-II). (Revised) |
Cost: PKR 711.630 million | Status: Approved |