P&D SECTOR
Strengthening of Program Management Unit (PMU) for Punjab Resource Management Program (PRMP-II) (Revised)
Cost: PKR 576.515 million | Status: Approved
Punjab Economic Opportunity Program (PEOP)
Cost: PKR 8783.970 million | Status: Approved
AGRICULTURE SECTOR
Establishment of Muhammad Nawaz Sharif University of Agriculture, Multan (Phase-II).
Cost: PKR 1363.197million | Status: Withdrawn
LIVESTOCK SECTOR
Rehabilitation & Mechanization of Govt. Livestock Farms (LES: Khushab, LES: Shergarh, LES: Jugaitpeer, LES: Fazilpur, LES: Rakh Ghulaman.
Cost: PKR 343.142 million | Status: Approved
TOURISM SECTOR
Feasibility and Designing for Development of Recreational Resort along River Indus at Attock Khurd. (PC-II)
Cost: PKR 9.112 million | Status: Approved
LITERACY SECTOR
Third Party Evaluation of Literacy Projects (PC-II). (Issue)
Cost: PKR 0.00 million | Status: Approved
Non-Formal Education Promotion Project with Japan International Cooperation Agency (JICA)
Cost: PKR 185.646 million | Status: Approved
HEALTH SECTOR
Up-Gradation of Major Shabbir Sharif Shaheed (Nishan-E-Haider) RHC Kunjah into 60 Bedded Tehsil Level Hospital, Gujrat.
Cost: PKR 331.680 million | Status: Deferred
IRRIGATION SECTOR
Rehabilitation of Trimmu-Sidhnai Link Canal (Controlling Seepage/Water-Logging Along (T-S) Link Canal.
Cost: PKR 2521.000 million | Status: Approved
Hiring of Consultancy Services for Monitoring of Projects under Provincial Development Programme (for period from 01.09.2009 to 30th June 2016) (PC-II)
Cost: PKR 950.492 million | Status: Approved
Hiring of Consultancy Services for Monitoring of Projects under Provincial Development Program (for period from 1st June 2016 to 30th June 2019) (PC-II)
Cost: PKR 1275.985 million | Status: Approved
PPH SECTOR
Extension / Rehabilitation of Urban Sewerage Scheme Gojra, Toba Tek Singh.
Cost: PKR 400.000 million | Status: Approved
Urban Water Supply Scheme Gojra (Phase-II), Toba Tek Singh.
Cost: PKR 532.942 million | Status: Deferred
Extension / Rehabilitation of Urban Sewerage Scheme Kamalia City (Phase-II), T.T. Singh.
Cost: PKR 360.000 million | Status: Approved
UD SECTOR
Laying of Lateral & Branch Sewer in Shadipura, Lahore.
Cost: PKR 338.835 million | Status: Approved
Restoration of Original Cross Section of 40 ft. of Sattukatla Drain from Ferozepur Road to PECO Road, Lahore.
Cost: PKR 698.000 million | Status: Approved
Rehabilitation / Improvement of Rawal Road from Airport Road to Chandni Chowk, Rawalpindi.
Cost: PKR 449.415 million | Status: Approved
Faisalabad Link Roads Development Program (FLRDP).
Cost: PKR 695.500 million | Status: Approved
Extension of Water Supply Distribution Network to Un-Served Areas of Faisalabad.
Cost: PKR 548.400 million | Status: Approved
Improvement / Rehabilitation of Sheikhupura Road from Nishatabad Overhead Bridge to PTCL Exchange Sargodha Road Faisalabad.
Cost: PKR 300.000 million | Status: Approved
Construction of Signal Free Junction at Azadi Chowk, Lahore.
Cost: PKR 4501.580 million | Status: Approved
DP SECTOR
Establishment of PMU & CIU for Punjab Intermediate Cities Improvement Program (PICIIP)(PC-II)
Cost: PKR 302.000 million | Status: Approved
ROADS SECTOR
Construction of road from Qadirabad to Pindi Bhattian via Chak Chatha length=63.75 Kms, District Hafizabad.
Cost: PKR 615.352 million | Status: Deferred
Dualization of Muridke Narowal Road from km 0.00 to km 42.00, District Sheikhupura (length=42.00 km) (Revised).
Cost: PKR 2823.618 million | Status: Approved
Widening / Improvement of Road from Jalalpur Jattan Shahbazpur Road Head Marala via Chopala length=17.21 Kms, District Gujrat.
Cost: PKR 226.104 million | Status: Approved
PUBLIC BUILDINGS SECTOR
Topographic Survey and Geotechnical studies for land sliding Zonization of Murree Hill area mainly located between old Rawalpindi-Murree road and Islamabad Murree Expressway, Murree. District Rawalpindi.
Cost: PKR 59.930 million | Status: Approved
Construction of Infrastructure of CTD Punjab: Construction of Regional Office CTD, Faisalabad.
Cost: PKR 348.792million | Status: Approved
Construction of Infrastructure of CTD Punjab: Construction of Regional Office CTD, Gujranwala.
Cost: PKR 313.628 million | Status: Approved
Construction of Infrastructure of CTD Punjab: Construction of Regional Office CTD, Multan.
Cost: PKR 333.506million | Status: Approved
Construction of Infrastructure of CTD Punjab: Construction of Regional Office CTD, Bahawalpur.
Cost: PKR 356.506 million | Status: Approved
Construction of Infrastructure of CTD Punjab: Construction of Regional Office CTD, D.G.Khan.
Cost: PKR 251.027 million | Status: Approved