Confirmation of the minutes of 78th PDWP meeting held on 23.06.2017 Discussed
HEALTH SECTOR
Infection Control Program, Punjab (Revised).
Cost: PKR 3,698.000 million| Status: Approved
Prevention and Control of Hepatitis B&C in Punjab. (Revised)
Cost: PKR 6044.076 million| Status: Approved
PPH SECTOR
Extension / Rehabilitation of Urban Sewerage Scheme Kamalia City (Phase-II), T.T. Singh. (Revised)
Cost: PKR 488.756 million| Status: Approved
IRRIGATION SECTOR
Installation of Weather Surveillance Radar at Sialkot.
Cost: PKR 770.000 million| Status: Approved